Saturday, December 11, 2010
Final Year d Uniten
huh, dah lama ak xupdate blog.. maklumlah busy skg ni.. dah final year upenya.. muahaha..
4 thn di uniten dilalui dgn tenang.. byk pengalaman yg ak dapat.. hehe.. tu je nk ckp.. Lps ni update plak..
Wednesday, August 11, 2010
SELAMAT MENYAMBUT RAMADHAN
Monday, June 14, 2010
Internship Service Units
Saturday, May 15, 2010
Internship ( SAVR units part 2)
hehe.. nk update blog pun susah, rmh xde internet.. heeee.. but dont worry, i can do it. hehe..
opss.. bm la plak.. hehe.. So, i follow SAVR about 1 month..The SAVR are responsible to fix the end connections from the TNB Distribution supply cables to the consumer’s meter. This section basically receives the electrical fixing infrastructure. Basically, this section handles, maintains and repairs the Low Voltage (LV) fixings in the Bachok area so:
2. Preventing supply disruptions and faults on the fixings
3. Maximizes the lifespan of the fixings.
Pgi2 minum teh panas lu dgn akim
Tayar lekak plok dale pasir
tarik kabel sampai puncak tiang. ( kabel jatuh ats jln raya)
Internship ( SAVR Units)
SAVR stand for Sesalur Atas Voltan Rendah. Report to Mr Zulkifli Abdullah. I was assigned to follow Sesalur Atas Voltan Rendah (Low Voltage Overhead Line) team. An overview delivered by technician on the types of overhead cables and fuses ratings, the structure and construction and also the basic components in Low Voltage Overhead Line. I was assigned to follow Low Voltage Overhead Line team within 1 month. The work scopes mostly installations of electrical poles and overhead distributions cables. Besides that, this team responsible to repair and maintain about electric problems.
kerja nk cabut tiang.
LV BOX
Danger (Abe Awi)
Pokok tumbang ats kabel
Rusing blako.. ( from left: pakcik hamid, abe yie n pak Do)
Rajin sungguh bdk nih
siap doh ni.
Monday, May 10, 2010
Internship ( Street Lighting Units)
Huh.. i have got more n more experiences.. Hehe.. This week, i follow street lighting unit. This unit is to make new installation of street lighting. besides that, this geng are required to repair problem about pole lighting that complain by consumer. hehe.. My supervisor is Pn Rukiah. person who that responsible to take charges are Mr Sukri aka Pakcik Yie and the driver's Mr Saberi aka Abe Yie..
Wednesday, April 28, 2010
Internship ( week 3)
Salam.. huhu.. This week, I follow metering units. The work scopes were to check meter whether ok or not, install new meter and replace meter. Before “round” to find house, Pakcik Sidi and Abe Min brief me some part of meter and the function of meter. There are two type of meter that 1 phase meter and 3 phase meter. Besides that, meter divided into two; electronic and mechanical meter.
1 PHASE METER
Usually using 60A cut out and 30m fuse. Use one cut out and one fuse. There are 4 wires that connect to Tnb meter. 2 phase wire( 1 from street pole to meter and 1 from meter to db inside house) and 2 neutral wire ( 1 from street pole to meter and 1 from meter to db inside house).
3 PHASE METER
Usually used 100A cut out and 60m Fuse. Use 3 cut out and 3 fuse. For house that used larges load. 3 phase wire that indicate red, yellow and blue. 1 neutral wire color with black.
CT METER
Used in commercial building or biggest building that used larges of load. That power supply are direct connection from underground cable. All task relation with CT meter will refer to TNB kota bharu. Every day, many meters should install. This meter very cheaper than lct meter. So, tnb responsible to fulfill the customer demand. Hehe..